Saturday, September 18, 2010

September Wall Hanging

Finished September wall hanging and have October ready to be quilted.  I'm still checking out a spot in the 5th wheel to hang the quilted months.
Spent the day putting things away or really hiding them.  Still making lists of things we may need.  With the slides out it's very comfortable.  We're looking forward to our first outing to the Amana Colonies.

Thursday, September 16, 2010

My first entry

My sewing room, my favorite room.   Located in the lower level with walk out basement and windows on 2 sides.  Lots of light to sew by.